powerboatr
living well in Texas
Sunday here in Huntsville, the International truck engine engine assembly building
placed an add. through Kelly temps services
Wanted third shift, 10.85 hr approx 6-8 months
Sounds like the re-tool of the engine assembly building is going on as planned,

placed an add. through Kelly temps services
Wanted third shift, 10.85 hr approx 6-8 months
Sounds like the re-tool of the engine assembly building is going on as planned,